Bananas are processed
through a two-step process. First, the fruit is separated in a machine with a
capacity of 1175 bananas per hout Next, the fruit is wrapped with a machine
that has a capacity of 825 bananas per hour Demand for bananas exceeds supply0
Round your answer to three decimal places
In a pull system, what
will be the utilization of the first machine?
A copy machine is
available 24 hours a day. On a typical day, the machine produces 119 jobs. Each
job takes about 3 minutes on the machine, 1 minutes of which is processing time
and 2 minute is setup time (logging in defining the job). About 22 Percent of
the jobs need to be reworked, in which case the setup time and the processing
time have to be repeated. The remainder of the time, the equipment is idle.
What is the OEE of the equipment?
(Round your percentage
answer to 1 decimal place)
What is the OEE of the equipment? percent