solution

Company produces a line of drones popular among teenagers and young adults. The production line consists of 10 work stations with one single worker per station performing one single task. Cycle times are summarized in the table below:

Task

Description

Time (Seconds)

Cost of 5 Seconds Reduction

1

Assemble frame

65

$400

2

Affix landing gear

75

$500

3

Install battery

65

$300

4

Assemble circuit board

80

$800

5

Insert microprocessor

45

$300

6

Insert UHF receiver

60

$100

7

Install GPS

50

$300

8

Install propellers

70

$700

9

Install connectors

55

$400

10

Mount drone shell

70

$500

a.How much time does it take to assemble one unit of drone?

b.Which task is the bottleneck in this process?

c.Based on the table above, what is the maximum capacity of the drone production line in units per hour?

d.Calculate utilization of the worker at task #9

e.Determine how long would it take to produce 100 drones starting from an empty system.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"