solution
A supply company ships its supply in lots of size N=5,000. A single sampling plan with sample size n=50 and lot rejection criterion c=2 was used to examine lots. Rejected lots will be 100% inspected and all defective items reworked and returned to the lot.
a. Make a map of the operating characteristics (OC curve) for the sampling plan.
b. Determine the lot quality level that gives a 90% lot rejection probability.
c. The company’s management plans to change the sampling rejection criteria to c=0, on the grounds that
these criteria are more consistent with the zero-defects program.
– What do you think about the change plan?
– Create an OC map for the new sampling plan.
d. Suppose the lot being inspected (incoming lot) contains defective items as much as 0.5%. What is the probability of rejecting the lot with the two sampling plans? Calculate AOQL (Average Outgoing Quality Level) & ATI (Average Total Inspection) for both sampling plans.
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

