solution

Stephanie Robbins is the Three Hills Power Company

management analyst assigned to simulate

maintenance costs. In Section 14.6 we describe the

simulation of 15 generator breakdowns and the repair

times required when one repairperson is on duty

per shift. The total simulated maintenance cost of

the current system is $4,320.

Robbins would now like to examine the relative

cost-effectiveness of adding one more worker per

shift. The new repairperson would be paid $30 per

hour, the same rate as the first is paid. The cost per

breakdown hour is still $75. Robbins makes one

vital assumption as she begins—that repair times

with two workers will be exactly one-half the times

required with only one repairperson on duty per

shift. Table 14.13 can then be restated as follows:

REPAIR TIME REQUIRED (HOURS) PROBABILITY

0.5 0.28

1 0.52

1.5 0.20

Break down number random number time between breakdowns time of breakdown time repairperson is free to begin random number repair time is required time repair ends number of hrs machine down

69

98
2 94
36 90
49 36
71 6
99 78
32 23
10 67
75 89
21 85
95 29
90 21
94 25
38 73
97 69

(a) Simulate this proposed maintenance system

change over a 15-generator breakdown period.

B) Should Three Hills add a second repairperson

each shift?

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"