Individual Excel Solver Computer Project

Natural Furniture Company manufactures three outdoor products, chairs, benches, and tables. Each product must pass through the following departments before it is shipped: sawing, sanding, assembly, and painting. The production time available in each department each week and the minimum weekly production requirement to fulfill contracts are as shown in the table below

Weekly production time and quantities

Department

Capacity

(In hours)

Product

Minimum production level

Sawing

450

Chairs

100

Sanding

400

Benches

50

Assembly

625

Tables

50

Painting

550

The production time requirements (in hours) and profit per unit of each product are summarised in the table below.

Production time and profit per single product

Hours required

Product

Sawing

Sanding

Assembly

Painting

Unit profit

Chairs

1.5

1.0

2.0

1.5

$15

Benches

1.5

1.5

2.0

2.0

$10

Table

2.0

2.0

2.5

2.0

$20

The production manager has the responsibility of specifying production levels for each product for the coming week.

(a) Formulate a linear programming model for this problem.

(b) Set up a spreadsheet model for this problem and use the Excel Solver to find the optimal solution.

(c) State the optimal solution and the value of the objective function.

 