solution

Track lead Inc. is a tire manufacturer and has developed THREE (3) prototype tire designs for skid-proof in wet road conditions. The costs of making the tires are provided below: Tire Fixed Cost (RM) Variable Cost per Unit (RM) A 60,000 30 B 90,000 20 ? 120,000 15 There are THREE (3) levels of unit sales: 4,000 units, 7,000 units, and 10,000 units; the respective probabilities are 0.30, 0.50, and 0.20. The selling price will be RM75 per tire. With the use of spreadsheets only, solve the following: (a) Determine the expected payoff for each set. Which is the best action? (10 marks) (a) Calculate the EVPI. marks) (5 (b) Compute the expected opportunity losses.
 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

Pharma Medical is a producer of medical micromotors for worldwide manufacturers of medical and healthcare equipment. Basing on past 12 periods of demand in table below, Pharma would like to determine the next period’s production plan. Time Period Micromotors Demand (S, Million) 1 1.7 2 2.3 3 3.5 4 2.8 5 2.7 6 3.2 7 4.6 8 3.8 9 3.5 10 4.0 11 4.8 12 5.3 With the use of spreadsheets and solver only, solve the following: (a) For the period 13, forecast with a two-period & four-period simple moving average respectively. (4 marks) (b) For the corresponding MSE values in (a), which method has a more accurate forecast? (4 marks) (C) For the period 13, forecast with a two-period and four-period weighted moving average.
 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

On The Move

Now that senior management had shown its faith in her abilities by promoting Jocelynto supervise the front of house staff at the theatre, she was determined to be die best supervisor that she could. She knew her mentor from rhe personnel department, Sue, must have had a lot to do with her promotion. Sue had recruited her to the theatre complex three years ago and seemed to have raken a personal interest in her since. She was always friendly; never failing to rake a few minutes to chat to Jocelyn .a.bout the goings-on in the theatre, plans for upcoming events, personnel moves becween the departments, and so on. Several rimes she had requested that Jocelyn be pm on working committees looking into various aspects of client service and productivity. This had given Jocelyn a broad understanding of the workings of the meatre and exposed her to people from every department at all levels. Sue had even arranged for her to undertake a few project assignments in different areas of the theatre, as well as be on the very high-profile Enterprise Bargaining working group. Jocelyn made the most of these opportunities, learning everything she could and conrriburing as fully as she felt able. She tried to ‘dress the part’ when she was on these special committees and teams; in fact, she took her cues from the way Sue dressed. She was friendly and cheerful with everyone and made a conscious effort to keep up her contacts with people once the committees disbanded. In this way, Jocelyn gradually became known throughout the theatre compiex as a dedicated, hard-working, cheerful and effective employee. Her supervisor appreci­ at d her efforrs too. She always presented information to him the way he liked it, came up with good ideas and suggestions and seemed ro morivare che rest of the tea.in. So when it came time for him to move on from supervising the from of house, he was happy to endorse Sue’s recommendation that Jocelyn step imo his shoes.

Answer the question below

Q1. Explain the sources of power and influence Jocelyn seemed to be using most and discuss how she acquired these?

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

A bread-making factory has the production process shown in the figure below. There are five operations in sequence. The product only needs to go through one of the parallel machines in each case where parallel machines exist. What is the bottleneck operation of this process?

a. What is the throughput time? [ Select ] [“245 minutes”, “35 minutes”, “515 minutes”, “325 minutes”, “295 minutes”]

b. What is the bottleneck operation and time? [ Select ] [“Cut; 35 minutes”, “Proof; 120 minutes”, “Pack; 80 mnutes”, “Mix at 100 minutes because it is the beginning of the process”, “both Proof and Bake for a total of 60 minutes”]

c. What is the hourly capacity of the operation? [ Select ] [“1.71 units”, “35 units”, “1 unit”, “1.2 units”, “60 units”]

 