solution

Instructions

Case 3-3 (Revised)

Business Emphasis – Restaurant

Business Emphasis – Restaurant Assume that you and two friends are debating whether to open a restaurant that will be called Cozy Kitchen. Initially, Cozy Kitchen will open three stores locally, but the business plan anticipates going nationwide within five years. Currently, you and your future business partners are debating whether to focus Cozy Kitchen as a “do-it-yourself” or “do-it-for-me” business. A do-it-yourself business emphasizes the sale of ingredients for predetermined meals which customers can choose from a menu and the ingredients for the meals will be delivered to customers. The customers will prepare the meals themselves at their homes. A do-it-for-me business emphasizes the sit-down restaurant with a take-out meal option for customers. 1. In groups of three or four, discuss whether to implement a do-it-yourself or do-it-for-me business emphasis. List the advantages of each emphasis and arrive at a conclusion as to which emphasis to implement. 2. Provide examples of real-world businesses that use do-it-yourself or do-it-for-me business emphasis.

Please help me complete this project.

there is no more information available !

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

Hi Lucy, how are the job descriptions going?

I’ve developed the job
descriptions, but I noticed there may be some discrepancies with my perceptions
of what the job duties should be, and what the employees actually do. I need to
do some more research to clarify specific duties.

You may want to observe
your employees to see what tasks and responsibilities they actually do. Of
course, you should let them know why you are observing them.

bkay, thanks. I will
observe them. Observing the employees was helpful for me to better understand
each employee’s job duties. While observing, some of the employees mentioned
that I might be observing them during a downtime in work. As with any job,
there were busy times, and times that are little less hectic. I think I need
more information. I’ll start with Quinn.

What is the next step
Lucy should take?

Ask employees to keep a
work diary for a period of time (1-2 weeks), in order for them to document
their duties on a daily basis.

Interview employees to
see from their perspective what their job duties are

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

It was July 2, and Kathy Saxton had just been given her first assignment, the “Wire Management Program” (WMP) by Scott Carpenter, purchasing manager of Atlanta-based Hansen Equipment Inc. The purpose of the WMP was to reduce the supplier base for the company’s wire and cable requirements. As a newly hired buyer, Kathy wondered how to proceed.

HANSEN EQUIPMENT

Hansen Equipment Inc. (Hansen) was a relatively new division of Hansen Equipment International, a multinational electrical engineering and technology company. Hansen generated sales of $130 million in the past year and had forecast growth of 25 percent for each of the upcoming four years.

Hansen manufactured material handling systems, mainly for customers in the automotive industry. Its principal product lines were assembly line equipment and press automation equipment. Assembly line products included units such as framers, in which a vehicle frame was fed onto a line and welded in specified areas. Press automation products were units that moved parts—such as vehicle frames, doors, and hoods—between large stamping machines as part of the customer’s manufacturing process. Hansen’s systems were built in Atlanta, tested, approved, disassembled into sections, shipped to the customer’s facility, and then reassembled.

All Hansen systems were custom designed, based on the unique requirements of the customer, including manufacturing equipment and product characteristics. Kathy estimated that 98 percent of component orders were job specific. Each Hansen system was composed of steel, mechanical, electrical, and hydraulic parts. Wires and cables were important parts of these systems. With automotive design changes occurring regularly, Hansen was constantly reconditioning previous systems or bidding on new lines. Hansen prided itself on customer satisfaction. In the automotive industry, a key factor was on-time delivery of equipment and systems.

HANSEN’S PURCHASING DEPARTMENT

Scott Carpenter supervised a purchasing department that included six buyers, with responsibilities divided into the following commodity groups: electrical, mechanical, hydraulic/pneumatic, robots/weld guns, affiliate-produced parts/fabricated components, and steel/other metals. Kathy was hired recently to replace two retiring buyers.

Kathy held an undergraduate business degree and, upon graduation, worked for a year as an inventory analyst at a multinational manufacturing organization. She had applied to Hansen after visiting its display booth at a local manufacturing trade show. Kathy was eager to make an early contribution at Hansen and she believed that the WMP presented an excellent opportunity.

Purchasing Process

Last year, Hansen’s total component purchases totaled $63 million. Hansen had a total supplier base of approximately 3,000 companies, of which less than 5 percent were regular suppliers. The first reason for having such a large number of suppliers was that newly hired buyers usually had previously established relationships with certain suppliers. The second reason was that Hansen’s systems were custom designed, and most suppliers specialized in certain product areas.

When Hansen was awarded a job, its engineers used a computer-aided design (CAD) system to create plans for the product. Part of this process consisted of determining every subcomponent within the final system. These components were divided into hydraulic, mechanical, and electrical categories and were entered into Hansen’s ERP system to create a bill of materials (BOM). Requisitions for specific parts were then created and sent to the appropriate buyer, based on the type of commodity needed. Buyers then created purchase orders to satisfy the expected demand.

Page 26

There was usually some variation between actual requirements and initial expectations. When components were over ordered, they needed to be returned to the supplier or held in inventory until a need arose in the future. Returning products to suppliers was time consuming, while keeping over-ordered material in inventory tied up company funds. The CFO estimated inventory carrying costs at 15 percent per annum. There were also circumstances where shortages were created because volumes exceed initial forecasts or materials were not included in the original BOM. Recently, many items were labeled as “rush,” putting pressure on the buyers to expedite orders.

Assembly line and press automation systems were divided into “cells,” which were stations within the system designed to perform a specific operation. Some jobs were comprised of more than 10 cells, and it was common to have different engineers working on cells within the same system. Engineers were responsible for entering material requirements for their designated cells. Although there were often common parts among the cells in the system, there could be numerous orders each day for the same components (e.g., 10-foot lengths of wire), creating unnecessary ordering costs, since each line in the purchase order had to be handled individually. This was often the cause of administrative problems and headaches, since a purchase order for electrical items could contain more than 100 items.

When materials were received, they were kept in an unlocked warehouse area until needed. There were some incidences of workers “borrowing” items required for jobs, which had not been ordered or which had not yet arrived. This created inventory shrinkage problems with no direct accountability. In some cases, the supervisor in the warehouse area might issue parts from another job to one with a more urgent requirement; however, approval had to be obtained from the project manager.

The bottom line was that material availability was important, since each project required that the cells be completed in sequence to ensure that the system operated properly. Missing components could significantly delay the completion of later cells.

WIRES AND CABLES

Wires and cables were considered commodity products within the electrical industry. Wires were fabricated from copper rods rolled into a desired thickness and then covered with a protective coating. Cables were made by combining two or more copper wires, separated by insulation, and using an outer covering or jacket. Wire differed from cable primarily in the number of conductors, jacketing, insulation, and resistance to external factors.

Occasionally, situations arose in which a product was specified by the end user. In these instances, Hansen engineers were forced to use the specified product, which might only be available through nonstandard suppliers. Specified products occurred more often with cables than with wires.

Scott Carpenter had recently initiated the WMP believing that Hansen could improve value for all of its wire and cable requirements from volume leverage. Rationalizing the supplier base would also save administrative time currently spent processing multiple supplier invoices. A stronger relationship could be fostered with the chosen supplier, which could help increase the priority of Hansen orders and open further opportunities for cost savings. Also, transportation costs could be reduced if all items were shipped from a single source. Finally, sourcing from a single supplier would allow the buyer to focus on issues involving higher dollar values.

Kathy felt that the WMP gave her an ideal opportunity to analyze what changes to Hansen’s supply processes would be possible. She knew, however, that buy-in from key users would be required before implementing any significant changes. Scott had given her the impression that the WMP should be implemented before the end of October.

ELECTRICAL COMPONENT SUPPLIERS

Hansen’s wire and cable requirements for any one job were typically purchased from three to six different electrical suppliers. The suppliers’ product lines contained significant overlap, which led to the desire of reducing the base to a single source. The amount of wire and cable purchased last year was approximately $1.4 million. Wire and cable purchases were predicted to increase at the same rate as corporate sales.

Kathy asked some shop floor employees about Hansen’s current six suppliers. The employees volunteered both positive and negative comments regarding the various suppliers. Kathy considered these comments as “unofficial” past performance reviews. However, she got the impression that the some employees seemed to prefer certain suppliers because of friendships that had been developed. She was hesitant to consider all comments provided due to potential biases and was also skeptical about some of the comments of the other buyers for similar reasons.

Page 27

Kathy discovered that the receiving manager, Wesley Wen, had been keeping records of supplier performance for the last 30 months because of Hansen’s ISO 9001 certification requirements. His data included on-time delivery performance, product returns, and overall supplier service. Kathy also learned that there had been no significant quality problems with any of Hansen’s current suppliers according to Wesley’s information—it appeared that the suppliers provided relatively uniform quality. With these records, in conjunction with his conversations with Wesley, Kathy believed she could develop an objective assessment of the suppliers’ past performance.

NEXT STEPS

Scott Carpenter had created the WMP to seek benefits from reducing the number of wire and cable suppliers. Kathy’s initial thought was that a single supplier could provide the best prices for Hansen’s annual requirements. However, she realized that there were arguments both in favor and against using this approach. She would have to analyze the capabilities and managerial abilities of each company in order to reach a decision.

Kathy began to think about possible methods to reduce the total number of wire and cable suppliers. Hansen had established strong relationships with some of the suppliers, and she therefore wanted to give all interested companies an opportunity to present their cases. Whatever she decided to do, Kathy would need to justify her recommendation to Scott and to Hansen’s engineers and other employees.

IV. Choice and Rationale – What would you do?

State here your choice, A or B or ___ and the detailed reasons for your choice. You may also state your reasons for not choosing the other alternative solutions.

  1. Appendix to include calculations, charts, diagrams, or graphs to support sections I-V

It’s necessary to include supporting qualitative and quantitative material in the last section to a maximum of two pages. All calculations and figures must be clearly labeled and referred to in the relevant section I-V.

i just need the answer for the second part please

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

You have been asked to compute the capacity of the four resources at a local burger joint.

  • >On average, 80% of customers eat at the restaurant and 20% order to go. To simplify the analysis, assume that each customer only places a single order.
  • >The menu consists of burgers, fries, milk shakes, and soft drinks. On average, 90% of customers order a burger and 60% of customers who order a burger also order fries. For drinks, 40% of customers order a milk shake and 50% order a soft drink. The remaining 10% do not order a drink.
  • >All customers place their orders at the registers. For those who choose to dine in, the food and drinks are delivered to the table by the waitstaff. Patrons who place a to-go order wait at the register and pick up their order.
  • >Placing an order takes on average 3 minutes if the customer pays with a credit card and 4 minutes if the customer pays with cash. 90% of customers pay with a card and 10% pay with cash. There are two cashiers taking orders.
  • >Burgers and fries are prepared in the kitchen where three line cooks work. On average a burger takes 6 minutes to prepare, and an order of fries takes 3 minutes.
  • >Milkshakes are prepared at the milkshake bar where one staff member works. On average, it takes 5 minutes to prepare a milkshake. The same staff member also prepares the soft drinks, and this step takes 1 minute per drink.
  • >The waitstaff takes on average 10 minutes to serve each customer at various steps in the process. There are two waitstaff working at the restaurant.
  • >On average 5% of the dine-in customers send their burgers back to be recooked because the meat is undercooked. Recooking takes 2 minutes at the kitchen.
  • a. Compute the capacities of the cashiers, line cooks, milkshake bar, and the waitstaff in customers per hour.

  • b.Which resource is the bottleneck and what is the capacity of the restaurant?

The restaurant decides to redesign the order taking process. Under the new process, the cashier will only take the to-go orders and all to-go orders will be paid by card. The cashier will also process the payment (collected by waitstaff) for the dine-in customers. Dine-in customers pay either by credit card (90%) or cash (10%). Dine-in customers will place their orders and pay at the table. This will increase the average processing time for the waitstaff to 14 minutes (including the time to take orders and collect checks). As part of the redesign effort, the restaurant plans to train one of the cashiers as waitstaff reducing the number of cashiers to one and increasing the waitstaff to three. What is the capacity of the restaurant after the redesign is implemented?

 