solution

A passenger whose luggage didn’t arrive on his flight from Boston to San Francisco is sending a string of angry tweets from the baggage claim at the San Francisco airport, accusing JetBlue of everything from lying to stealing his luggage. He is including the @JetBlue handle in every tweet, so his rants are showing up in the timelines of the company’s followers on Twitter—all 1.9 million of them. How should you respond?

a. Respond to every one of his tweets with a message that JetBlue is an honest company that would never steal luggage or lie to a passenger. In a situation like this, you have to fight fire with fire.

 b. Ignore the passenger’s rants; every time you respond, you increase the chance that more of your Twitter followers will see his complaints. He will eventually get tired of complaining, and the storm will blow over.

 c. Get in touch with Twitter and ask the company to suspend the man’s account. No one should be allowed to spread misinformation like that on social media.

d. Reply to one of his tweets with an apology for the trouble he was encountered and an offer to switch to direct messaging to work out a solution to his problem. As soon as you send this tweet, telephone your colleagues in San Francisco. Explain the situation, ask them to figure out which baggage carousel the man is likely to be near (based on his flight info), and ask them try to locate the man and talk to him in person. People are more prone to be abusive on social media than in person, and the employee in San Francisco might be able to convince him to stop tweeting and help reconnect him with his luggage.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

Reconsider the Tinker Construction Co. problem presented in Problem 16.17. While in college, Sean Murphy took a management science course that devoted a month to linear programming, so Sean has decided to use linear programming to analyze this problem.

a. Consider the upper path through the project network. Formulate a two-variable linear programming model (in algebraic form) for the problem of how to minimize the cost of performing this sequence of activities within 12 months. Use the graphical method to solve this model.

b. Repeat part a for the lower path through the project network.

c. Combine the models in parts a and b into a single complete linear programming model (in algebraic form) for the problem of how to minimize the cost of completing the project within 12 months. What must an optimal solution for this model be? E*

d. Formulate and solve a spreadsheet model in the format of Figure 16.14 for this problem. E*

e. Check the effect of changing the deadline by re-solving this model with a deadline of 11 months and then with a deadline of 13 months. 16.19. Reconsider the Electronic Toys Co. problem presented in Problem 16.14. Sharon Lowe is concerned that there is a significant chance that the vitally important deadline of 57 days will not be met. Therefore, to make it virtually certain that the deadline will be met, she has decided to crash the project, using the CPM method of time–cost trade-offs to determine how to do this in the most economical way. Sharon now has gathered the data needed to apply this method, as given below.

The normal times are the estimates of the means obtained from the original data in Problem 16.14. The mean critical path gives an estimate that the project will finish in 51 days. However, Sharon knows from the earlier analysis that some of the pessimistic estimates are far larger than the means, so the project duration might be considerably longer than 51 days. Therefore, to better ensure that the project will finish within 57 days, she has decided to require that the estimated project duration based on means (as used throughout the CPM analysis) must not exceed 47 days. a. Consider the lower path through the project network. Use marginal cost analysis to determine the most economical way of reducing the length of this path to 47 days.

b. Repeat part a for the upper path through the project network. What is the total crashing cost for the optimal way of decreasing estimated project duration to 47 days? E*

c. Formulate and solve a spreadsheet model that fits linear programming for this problem. 16.20.* Good Homes Construction Company is about to begin the construction of a large new home. The company’s president, Michael Dean, is currently planning the schedule for this project. Michael has identified the five major activities (labeled A, B, . . ., E) that will need to be performed according to the following project network. He also has gathered the following data about the normal point and crash point for each of these activities. These costs reflect the company’s direct costs for the material, equipment, and direct labor required to perform the activities. In addition, the company incurs indirect project costs such as supervision and other customary overhead costs, interest charges for capital tied up, and so forth. Michael estimates that these indirect costs run $5,000 per week. He wants to minimize the overall cost of the project. Therefore, to save some of these indirect costs, Michael concludes that he should shorten the project by doing some crashing to the extent that the crashing cost for each additional week saved is less than $5,000.

a. To prepare for analyzing the effect of crashing, find the earliest times, latest times, and slack for each activity when they are done in the normal way. Also identify the corresponding critical path(s) and project duration.

b. Use marginal cost analysis to determine which activities should be crashed and by how much to minimize the overall cost of the project. Under this plan, what is the duration and cost of each activity? How much money is saved by doing this crashing? E*

c. Now formulate a spreadsheet model that fits linear programming and repeatedly solve it to do part b by shortening the deadline one week at a time from the project duration found in part a.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

The College of Business at Tech is planning to begin an online MBA program. The initial start-up cost for computing equipment, facilities, course development, and staff recruitment and development is $350,000. The college plans to charge tuition of $18,000 per student per year. However, the university administration will charge the college $12,000 per student for the first 100 students enrolled each year for administrative costs and its share of the tuition payments.

(a). How many students does the college need to enroll in the first year to break even?

(b). If the college can enroll 75 students the first year, how much profit will it make?

(c). The college believes it can increase tuition to $24,000, but doing so would reduce enrollment to 35. Should the college consider doing this?

Problem 2:

The Valley Wine Company produces two kinds of wine—Valley Nectar and Valley Red. The wines are produced from 64 tons of grapes the company has acquired this season. A 1,000-gallon batch of Nectar requires 4 tons of grapes, and a batch of Red requires 8 tons. However, production is limited by the availability of only 50 cubic yards of storage space for aging and 120 hours of processing time. A batch of each type of wine requires 5 cubic yards of storage space. The processing time for a batch of Nectar is 15 hours, and the processing time for a batch of Red is 8 hours. Demand for each type of wine is limited to seven batches. The profit for a batch of Nectar is $10,000, and the profit for a batch of Red is $15,000. The company wants to determine the number of 1,000-gallon batches of Nectar (x1) and Red (x2) to produce in order to maximize profit.

  1. Define the decision variables and write down the objective function of the linear programming model for this problem.
  2. Write down the constraints of the linear programming model for this problem.

Problem 3:

For the following Linear Programming model;

Maximize Z = 80x1 + 60x2
subject to

3x1 + 8x2 = 50

45x1 + 30x2 = 180

x1, x2 = 0

Write down the Linear Programming standard form by adding slack variables

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

How could this be solved in Excel? Gloria’s Sauce on-line business uses a dedicated data line to connect their electronic business to the internet. They have been in business for one year and have had the same bandwidth (Internet access capacity) for that entire year. Their percentage utilization is given as follows:

Month

Bandwidth

January

33.5%

February

36.2%

March

42.1%

April

45.7%

May

50.2%

June

53.9%

July

62.0%

August

60.3%

September

63.7%

October

73.1%

November

72.7%

December

79.3%

Produce a forecast for the next month (January of next year) using each of the following techniques. A) Three period moving average. B) Three period weighted moving average using the weights of 1, 2, and 5. C) Exponential smoothing using the forecast for the first period of 34% and a = 0.8. D) Linear trend model. E) When do you think Gloria will need additional bandwidth?

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"