solution

Routing problems in networks are the problems related to sequencing and, of late, they have been receiving increased attention. Such problems usually occur in the areas of transportation and communication. A network problem involves the determination of a route from city i (origin) to city i (destination) for which there exist a number of alternative paths at various stages of the journey. The cost of journey, which may be function of distance, time or money, is different for different routes and the problem is to find the minimum cost route. Theoretically, the procedure involves determination of the cost of all the possible routes and selecting the one with minimum cost. However, in actual practice the number of such feasible alternatives is too large to be tried one by one. For instance, with 6 alternative paths, the number of possibilities is 51 = 120, with 9 paths the number becomes 8! = 40,320, while for 21 paths it increases to 2.4329 x 1018 This proves the necessity of a more efficient method to find the optimal path. There are many problems associated with networks, out of which the following two are important 1. The travelling salesman problem
 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

A manufacturer has decided to locate a new factory in the northwest U.S. to serve growing demand in that market and has narrowed the potential sites down to two finalists, City X and City Y. The manufacturer developed a list of important factors to consider in selecting the site. Next, each city was rated against each factor as shown in the following table. According to the Factor-Rating method, which city should the manufacturer select?

Factors City X City Y
Utility rates 100 110
Availability of skilled labor 78 75
Tax rates 40 60
Transportation 46 58
Proximity to suppliers 35 29
Quality of life 19 16

Question 9 options:

City Y

City X

Question 10 (4 points)

Design specifications require that a key dimension on a product measure 100 ± 10 units. The process being used to produce this product has a standard deviation of 2 units and process average is 95 units. What is the value of the process capability index? [Select the appropriate range in which your answer falls.]

Question 10 options:

less than or equal to 0.25

greater than 0.25 but less than or equal to 0.75

greater than 0.75 but less than or equal to 2.00

greater than 2.00 but less than or equal to 2.75

greater than 2.75

Previous PageNext Page

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

Which of the following statements is true about globalization?

A.It is the spread of businesses across national borders.

B.It refers to the direct investment in production or business in one country by a business from another country.

C.It refers to the stages a product or service goes through during its lifespan.

D.It is the degree of difference between the cultures of two nations.

Firms choose to compete in international markets to ________.

A.improve sales in the home market

B.extend the lifespan of their machinery

C.raise profits by lowering cost
D.find high-value expensive resources

Which of the following is true of the introduction stage of the product life cycle?

A.It emphasizes increased sales and high profits.
B.It tries to minimize competition by forming an alliance with rivals.

C.It focuses not only on a proven concept but also a low price.
D.It tries to get early adopters to try out a new product.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

What is the total cost to move products between workcenters A and B, and between workcenters B and D combined? [Select the appropriate range in which your answer falls.]
The transportation cost is $5.
The load summary: AB = 12, AC = 25, AD = 12, BC = 19, BD = 15, CD = 34.
Layout

Question 12 options:

More than $0 but less than or equal to $100

More than $100 but less than or equal to $200

More than $200 but less than or equal to $300

More than $300 but less than or equal to $400

More than $400

Question 13 (4 points)

A(n) __________ layout is a combination of ___________ and ____________ layouts.

Question 13 options:

workcenter; project; assembly line

project; manufacturing cell; workcenter

assembly line; functional; project

optimum; open; close

manufacturing cell; workcenter; assembly line

Question 14 (4 points)

Which of the following attempts to bring a balance between flexibility and efficiency in a production system?

Question 14 options:

workcenter

manufacturing cell

project layout

assembly line

Question 15 (4 points)

Completion of one or more work packages results in the completion of a ________________.

Question 15 options:

subtask

none of the choices are correct

project

program

task

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"