solution

Question 1: a) Explain the profit maximisation strategy for perfectly competitive firm. (1 mark) b) A perfectly competitive firm (Top Pizza) is selling pizza in Sydney market whose marginal cost (MC), average variable cost (AVC), and average total cost curves (ATC) are shown in the diagram below, Price $/slice MC ATC AVC 2.5 2 1.8 1.6 1.2 250 400 Q slices/day a. Determine the profit-maximising level of output at a price of $2.50 using the above diagram. (1 mark) b. At the profit maximising level of output, calculate how much profit will this producer eam if the price of pizza is $2.50 per slice? (1 mark)
Question 2 Think about the demand for the three popular laptops: ACER, ASUS and DELL. Using supply and demand diagrams, explain the effect on the demand for ACER or the quantity demanded of ACER (other things remaining the same) as a result of the following: a) The price of an ACER rises? (1 mark) b) The prices of an ASUS and a DELL decrease? (1 mark) c) Programmers who develop operating system for ACER become more costly to hire? (1 mark) d) In Sydney market, demand for ACER is given by the equation P = 30 – 2Qd and supply of ACER is given by the equation P = 6 + 4Q9. If Sydney market is in equilibrium, determine the equilibrium price (P) and quantity (Q) of an ACER and show the equilibrium condition in a graph. (2 marks) e) From the equilibrium in part d), if price of an ACER decreases to $16, what would be the quantity demanded for ACER, show this using a graph. In this case, calculate the price elasticity of demand for ACER. (2 marks) Question 3 Kim can produce 100 pies or 400 cakes an hour. Liam can produce 150 pies or 300 cakes an hour. a) If Kim and Liam spend 30 minutes of each hour producing pies and 30 minutes producing cakes, how many pies and cakes does each of them produce? (2 marks) b) Calculate opportunity cost of producing pies and cakes for Kim and Liam. (3 marks) c) Determine comparative advantage for each product and decide who should make pies and who should make cakes? Explain why. (2 marks) d) If Kim and Liam specialise and trade, what is the highest price of a pie at which Kim and Liam would agree to trade pies and cakes? What are the gains from trade? (3 marks)

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

DHL and Shopee launch new partnership, enabling China sellers to easily access Thai consumers. DHL eCommerce, a division of the world’s leading logistics company, Deutsche Post DHL Group (DPDHL), announced a partnership on October 2018 with Shopee,a leading e-commerce platform in SoutheastAsia and Taiwan. The partnership enablessellers in Chinato access consumers nationwide in Thailand, with an expansion of the partnership to other Southeast Asian markets in the pipeline(Bloomberg, 2018). “Direct selling to overseas consumers has never been easier and has become a key growth driver for many businesses, with e-commerce as an easy platform to enable international expansion. With logistics as a key enabler for cross-border retailing, we want to empower our customers to tap into this huge growth opportunity,” says Zhi Zheng, Managing Director, DHL eCommerce Greater China & North Asia. DHL guaranteed to provide effectiveand efficient logisticsservices through their massive volumeof trucks and planes, as Thailand is accessible from China by land. With DHL eCommerceintegrated on Shopee in China, sellers can easily sell and deliveron a single platform and keep track of all shipments directlythrough their mobile applications (Bloomberg, 2018).

“In recent years, we have witnessed the rapid development of Southeast Asia’se-commerce market, and a growing number of Chinese brands and sellers are staking a claim in this e-commerce goldmine. However, the geographical complexity of this region has created some logistical challenges. As a leading e-commerce platform in Southeast Asia, Shopee has built its Shopee Logistics Servcies (SLS), a highly efficient logistics delivery network that links China with Southeast Asia. We are delighted to work with DHL, the world’s leading logistics service provider, to grow SLS from strength to strength. Our collaboration will make Shopee the e-commerce platform of choice for cross-border sellers in China who aspire to sell into Southeast Asia,” said Jianghong Liu, Head of Shopee Cross Border eCommerce (Bloomberg, 2018). Currently, Shopee’s SLS is operational in seven (7) markets in Southeast Asia and Taiwan. With shipping costs 20% to 30% lower than typical market rates and better transit times, SLS makes cross border logistics a breeze for Chinese sellers. The collaboration between Shopee and DHL eCommerce will further enhance the capabilities of SLS. DHL will provide Shopee sellers and buyers with door-to-door logistics services, ensuring products will reach consumers in Thailand safely and quickly (Bloomberg, 2018).

  1. Propose an optimal and cost-efficient transport mode/s for DHL in conveying goods from China to Thailand.
 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

As a project expert, what additional recommendations would you make to the new manager to avoid minor variations to the project specifications.

PRINCIPLES OF PROJECT MANAGEMENT (30 MARKS)

Read the following Case Study and answer the questions that follow

I was brought in as the project manager of an advanced vehicle development project during the detailed design phase. The previous project manager had to resign from our company due to health reasons. My customer was the U.S. Department of Transportation. I had a team of six automotive design engineers working on my team. When I came into the project, the first thing I did was to learn the advanced vehicle specifications and the deliverables’ timeline. Then I learned the responsibilities and capabilities of every team member. I went to Washington, DC from California to meet with my customer’s project manager and to generate a close rapport with him. According to the original schedule, we were about two weeks late and the project was running over budget by 6% when I took over. One thing that bothered me was that my customer’s project manager was accustomed to phoning my team’s design engineers and ordering minor variations to the specifications without my knowledge. Nothing was documented and we were drifting away from the original project technical specifications. Apparently, the previous project manager closed his eyes to these minor specification variations and my customer’s project manager got used to forcing these minor specification changes on my design engineers. The first thing I did was to have an emergency team meeting. I went over all pending redlines that were not released through document control. The original specifications were still at revision A. I asked my team members not to accept any changes to the specifications without my knowledge. If a specification change was requested by the customer over the telephone, it did not matter how minor the change request was, it had to go through me. We all agreed to the new strict specification change rules. I revised the specifications to revision B and sent it to my customer’s project manager for his approval. Then I asked my customer’s project manager to travel to our plant so that we could finalize the revised technical specifications. I sat with him for three days face-to-face to go over each redline and got his final approval for revision B to the contract’s technical specifications. I told him that we were falling behind in the project due to the minor changes that were piling up. I asked him politely to go through all the changes with me whether they were minor or not. I told him he could talk to the individual design engineers as many times as he wished, but if there was a change looming on the horizon, he had to go through me. I emphasized that if the change was urgent, I could redline the technical specifications, sign it, and release it to the responsible design engineer that same day. Then I could have the technical specifications go through an official revision after piling up a couple of minor changes. If a change were going to affect the project schedule and cost, then I would provide him with my new schedule and cost estimates. I then could get the change approved and implemented only after his written concurrence with me regarding the new project schedule and project cost. He agreed with me on all my scope change procedures. I kept the project technical specifications current. I made sure that changes went through our document control with top priority. I always kept my design engineers on top of the technical specifications. I reviewed all the changes during our weekly team meetings. When the project design phase was completed after nine months, the technical specifications were at revision K. Similar technical specification control rules apply between your subcontractors and your company. Your customer should not be able to go to your subcontractor directly and ask for a scope change. Technical specifications make up one of the critical legs of a project structure. The other three critical legs of the project structure are the schedule, the cost, and the team. If one of those legs is out of sync, the project will start to wobble, lose control, and sink. As project managers, we will definitely fail. Keeping the scope changes of a project under tight control without causing your customer to become frustrated and angry is a must. LESSONS LEARNED FROM THIS PROJECT EVENT • Taking on a project in the middle of execution is very courageous and risky. • You must absorb and evaluate all aspects of your new project very fast. • You must initiate changes to project activities that you see as inappropriate. • It is always quite challenging to be able to change old established habits in a project environment. Source: Atesmen, K. (2015). Project Management Case Studies and Lessons Learnt. Boca Raton: Taylor & Francis Group.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

International Sourcing would permita rating of this sort There were too many variables and intangibles involved. A rating depended, first, on what you expected and, second, on whether that expectation was reasonable. “But you must have some basis for saying that our buyers are doing a good job, and that’s what I’m trying to get at. After all, purchasing is a tangible business. We spend X number of dollars, and we buy X tons or carloads of iron and nickel and bolts and coal and shipping cases. What I want to know is whether we’re getting full value for our dollars and whether it’s costing us more than it should to buy those materials. I’m not interested in how many purchase orders we issue or how much we deduct in cash discounts. I’m interested in the quality of our buying performance and in results. What I’d like to see is a simple report, maybe six or eight really significant figures that would give me the picture.” “I think we can get the figures for you?” said Frederick. “You’d have to make your own evaluation, as we do. At the start, I doubt that you could rate them any closer than excellent, good or fair. After the first few months, when you have a change to make comparisons, you may be able to apply some sort of scale – if you still think it’s worthwhile.” Frederick went back to the purchasing manager, and together they worked out a report to give Rishardson the information he wanted. Their first step was to define the areas of purchasing activity to be considered in an evaluation; the second step was to select measurable factors in each of these areas that were known or available from existing records and that would indicate to a significant extent the quality of performance and results obtained. They decided on the following areas: 1. Effectiveness of procurement as a service of supply 2. Price performance in buying 3. Cost reductions, specific savings 4. Inventory performance 5. Administrative performance, efficiency, cost of purchasing 6. Miscellaneous intangibles Under each of these headings they jotted down everything that came to mind pertinent to that area of activity and responsibility. Despite Rishardson’s aversion to statistical information, they found that much of the information was basically of this nature. International Sourcing However, the figures acquired more than statistical significance of the total; one of the problems was to find the appropriate standards of comparison and methods of presentation. Some of the factors were of a negative nature, inverse to the quality of purchasing performance; nevertheless, they were important in any complete evaluation “We’ll have to differentiate”, said Frederick, “between those that are rated on a low score, as in golf, and those that are rated on a high score, as in bowling. If we get to the point of making a numerical rating, there are simple mathematical means to take care of this, but we’ll run into the even tougher problem of assigning weights to the various factors”. The list of suggested possible indicators grew much longer than the half-dozen criteria that Rishardson had requested, but it was a necessary preliminary step to the process of selection. When they had finished, the following factors were noted on their worksheet . 1. Service of supply • Numbers of delinquent deliveries • Machine downtime due to lack of material • Schedule revisions necessary due to lack of material • Successful substitutions made by purchasing department to avoid downtime or schedule revisions • Number of rush orders handled (proportion of total orders of dollar volume) • Number of change orders issued Follow-up action (number of orders, cost of follow-up) • Number and amount of premium transportation charges paid to get deliveries on time • Number of deliveries rejected by inspection department . Cost of reworking substandard materials Number of overdue orders in open-order file Commodities for which alternate supply sources have been established and used . . . . Page 3 of 7 International Sourcing 2. Price performance · Number of price changes, up or down, from previous prices paid • Number of orders placed on competitive bidding • Number of orders placed by negotiation Commodities covered by term contracts (how long a term?) Actual prices paid compared with published market (market at time of purchase or at time of use; should this be shown for individual key commodities, as currently kept in chart form in purchasing office, or could it be put in the form of comparative price indices?) • Inventory valuable, actual cost versus replacement cost • Variances from standard costs • Direct material cost per unit of product Average cost of selected commodities, year to date and projected to annual average based on current price 3. Cost savings • Specific instances, savings projected on basis of annual usage, cumulative totals Savings through change of source Savings through changel method of buying Savings by substitution Savings by change in specification Savings by standardization Savings in transportation costs • Savings in manner of packaging . . . . . 4. Inventory performance • Ratio of dollar inventory to sales volume • Inventory increase or decrease during month Extent of forward coverage (weeks) Page 4 of 7 International Sourcing • Inventory turnover (by commodity classifications) • Number of items under maximum-minimum stock control • Number of stock-outs Quantity discounts earned by revision of stock limits 5. Efficiency of operation • Total cost of purchasing related to dollar volume • Number of buyers • Number of non-buying personnel (breakdown by functions) • Number of requisitions unprocessed within twenty-four hours • Number of small orders ($50 and under) · Cash discount earned and forfeited Average waiting time for salespeople 6. Miscellaneous • Sales of scrap and waste • Hours spent in staff training courses • Number of vendor’s plants visited • Business and professional meetings attended “I have evaluated your department on a number of other intangible factors,” Frederick said, “such things as morale, public relations, organization, supervision, and the like, as well as on adequacy of records and procedures. You’ll hear about these when the general manager discusses my report with you and other department heads. There’s no doubt they have a distinct bearing on performance, and they are reflected in many of the items we have set down here. They are measurable, too, but not in the same sense as your specific activities. They are factors that you, as department head, should be evaluating for yourself and on which top management will evaluate you. I have recommended a simple plan for doing this systematically and confidentially throughout all departments of the company.” Page 5 of 7 International Sourcing INSTRUCTIONS In this Individual Case Analysis (worth 20%), you are expected to review the information and then complete a report that will include: A) The 12-step case analysis (see PPTs below), that includes your recommendation, if you were in the position of Frederick, and B) Answer the following five questions: 1. Do you think the areas reviewed by Frederick were appropriate? 2. Was the rating system (excellent/good/fair) applied by Frederick reasonable? 3. Why do you feel this way? 4. What are three advantages of having a consultant conduct this type of review? 5. What are three disadvantages of having a consultant conduct this type of review? Please be sure to refer to the MGMT-6082-(01-02)-21F Individual Case Analysis Marking Rubric for direction on my expectations re this assignment (marked out of 100). For clarity, the five questions, listed above, form part of the Analysis Section of the Rubric (worth 24 marks). NOTE: Your report should be 8 to 10 pages in length.
 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"