solution

The Nutmeg Corporation produces three different products, each in a 1-pound can: Almond-Lovers Mix, Walnut-Lovers Mix, and the Thrifty Mix. Three types of nuts are used in Nutmeg’s products: almonds, walnuts, and peanuts. Nutmeg currently has 350 pounds of almonds, 150 pounds of walnuts, and 1000 pounds of peanuts. Each of Nutmeg’s products must contain a certain percentage of each type of nut, as shown in the following table. The table also shows the revenue per can as well as the cost per pound to purchase nuts. Percentage requirements per can Almonds Walnuts Peanuts Revenue per can Almond-Lovers Mix 80% 20% 0% $8.00 Walnut-Lovers Mix 20% 80% 0% $10.00 Thrifty Mix 10% 10% 80% $4.50 Cost per pound $4.50 $6.00 $3.00 a. Given Nutmeg’s current stock of nuts, how many cans of each product should be produced to maximize revenue? b. Does the solution you developed in part a change if Nutmeg is interested in maximizing contribution margin (defined as revenue per unit – raw material cost)? c. If 50 additional pounds of walnuts became available, how would your contribution-margin be maximizing solution from part (b) change?

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

A small fabrication firm makes three basic types of components for use by other companies. Each component is processed on three machines. The processing times follow. Total capacities (in hours) are 1,600 for machine 1; 1,400 for machine 2; and 1,500 for machine 3. Processing Time (HR) Component Machine 1 Machine 2 Machine 3 A 0.25 0.10 0.05 B 0.20 0.15 0.10 C 0.10 0.05 0.15 Each component contains a different amount of two basic raw materials. Raw material 1 costs $0.20 per ounce, and raw material 2 costs $0.35 per ounce. At present, 200,000 ounces of raw material 1 and 85,000 ounces of raw material 2 are available. Requirement (oz/unit) Component Raw Material 1 Raw Material 2 Selling Price ($/unit) A 32 12 40 B 26 16 28 C 19 9 24 a. Assume that the company must make at least 1,200 units of component B, that labor costs are negligible, and that the objective is to maximize profits. Specify the objective function and constraints for the problem. b. Use a computer package such as POM for Windows to solve the problem

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

A forecast of 320 units in January, 400 units in February, and 240 units in March has been approved for the seismicsensory product family manufactured at the Rockport facility of Maryland Automated, Inc. Three products, A, B, and C, comprise this family. The product mix ratio for products A, B, and C for the past 2 years has been 35 percent, 40 percent, and 25 percent, respectively. Management believes that the monthly forecast requirements are evenly spread over the 4 weeks of each month. Currently, 15 units of product C are on hand. The company produces product C in lots of 40, and the lead time is 2 weeks. A production quantity of 40 units from the previous period is scheduled to arrive in week 1. The company has accepted orders of 25, 9, 11, 5, 4, and 9 units of product C in weeks 1 through 6, respectively. Prepare a prospective MPS for product C and calculate the availableto-promise inventory quantities.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

An end item’s demand forecasts for the next 6 weeks are 30 units, followed by forecasts of 25 units for weeks 7 through 10. The current on-hand inventory is 60 units. The order policy is to produce in lots of 100. The booked customer orders for the item, starting with week 1, are 22, 30, 15, 11, 0, 0, 9, 0, 0, and 0 units. The lead time is 2 weeks. a. Develop an MPS for this end item. b. The marketing department has received six orders for this item in the following sequence: Order 1 is for 40 units to be delivered in period 3 Order 2 is for 60 units to be delivered in period 4 Order 3 is for 70 units to be delivered in period 6 Order 4 is for 40 units to be delivered in period 3 Order 5 is for 20 units to be delivered in period 5 Order 6 is for 115 units to be delivered in period 9 Assuming that the prospective MPS you developed in part (a) does not change, which orders would you be able to accept based on the available to promise (ATP)?

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"