Courtney Kamauf schedules production of a popular Rustic Coffee Table at Kamauf Enterprises, Inc. The table requires a top, four legs,  gallon of stain, 1 16 gallon of glue, 2 short braces between the legs and 2 long braces between the legs, and a brass cap that goes on the bottom of each leg. She has 100 gallons of glue in inventory, but none of the other components. All items except the brass caps, stain, and glue are ordered on a lotfor-lot basis. The caps are purchased in quantities of 1,000, stain and glue by the gallon. Lead time is 1 day for each item. Schedule the order releases necessary to produce 640 coffee tables on days 5 and 6, and 128 on days 7 and 8.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

Using the data for the coffee table in Problem 14.26, build a labor schedule when the labor standard for each top is 2 labor-hours; each leg including brass cap installation requires hour, as does each pair of braces. Base assembly requires 1 labor-hour, and final assembly requires 2 laborhours. What is the total number of labor-hours required each day, and how many employees are needed each day at 8 hours per day?

Problem 14.26

Courtney Kamauf schedules production of a popular Rustic Coffee Table at Kamauf Enterprises, Inc. The table requires a top, four legs,  gallon of stain, 1 16 gallon of glue, 2 short braces between the legs and 2 long braces between the legs, and a brass cap that goes on the bottom of each leg. She has 100 gallons of glue in inventory, but none of the other components. All items except the brass caps, stain, and glue are ordered on a lotfor-lot basis. The caps are purchased in quantities of 1,000, stain and glue by the gallon. Lead time is 1 day for each item. Schedule the order releases necessary to produce 640 coffee tables on days 5 and 6, and 128 on days 7 and 8.

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

First Printing and Copy Center has 4 more jobs to be scheduled, in addition to those shown in Example 3 in the chapter. Production scheduling personnel are reviewing the Gantt chart at the end of day 4.

â—† Job D was scheduled to begin early on day 2 and to end on the middle of day 9. As of now (the review point after day 4), it is 2 days ahead of schedule.

â—† Job E should begin on day 1 and end on day 3. It is on time.

◆ Job F was to begin on day 3, but maintenance forced a delay of 1½ days. The job should now take 5 full days. It is now on schedule.

â—† Job G is a day behind schedule. It started at the beginning of day 2 and should require 6 days to complete.

Develop a Gantt schedule chart for First Printing and Copy Center.

Example 3

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

The Baton Rouge Police Department has five detective squads available for assignment to five open crime cases. The chief of detectives, Jose Noguera, wishes to assign the squads so that the total time to conclude the cases is minimized. The average number of days, based on past performance, for each squad to complete each case is as follows:

Each squad is composed of different types of specialists, and whereas one squad may be very effective in certain types of cases, it may be almost useless in others.

a) Solve the problem by using the assignment method.

b) Assign the squads to the above cases, but with the constraint that squad 5 cannot work on case E because of a conflict.

 