solution

FOOTHILLS CONSTRUCTION Foothills Construction Company is a Denver-based construction company that specializes in subcontracting the development of single amily homes. In business since 1993. Foothills Construction Company has maintained a talented pool of certified staff and ndependent consultants allowing the flexibility and combined experience required to meet the needs of its nearly 300 completed projects in the Deaver metropolitan area. The field of operation methods that Foothills Construction is responsible for as it relates to building include structural development, heating and cooling, plumbing, and electricity The company charpes its clients by billing the hours spent on each contract. The hourly billing rate is dependent on the employee’s position according to the field of operations (as noted below). Figure GP.1 shows a basic report that Foothills Construction managers would like to see every week concerning what projects are being assigned as well as a summary of assignment hours and changes. Foothills Construction organizes its internal structure in four different operations: Structure (500). Plumbing (501). Electrical (502). and Heating and Ventilation (503). Each of these operational departments can and should have many subcontractors who specialize in that area Figure GP. Foothills Construction Project Detail PROJECT X FOOTHILLS CONSTRUCTION PROJECT DETAIL ????? ?? ????? ??? WASTARPTAR 2018 DESCRIPTION AR CHARGEUR a Pue 292 Because of the boom in home sales over the last several years, Foothills Construction has decided to implement a relational database model to track project details according to project name, hours assigned and charges per hour for each job description Originally. Foothills Construction decided to let one of its employees handle the construction of the database. However, that employee has not had the time to completely implement the project. Foothills Construction has asked you to tale over and complete the developmeat of the database. The entity classes and primary keys for the database have been identified as the following: Entity Primary Kay Project Employee Job Assign Project Number Employee Nurnber Job Number Assign Number The following business rules have also been identified: 1. A job can have many employees assigned but must have at least one. 2. An employee must be assigned to one and only one job number. 3. An employee can be assigned to work on one or more projects. 4. A project can be assigned to any one or many employees. Your job is to be completed in the following phases: 1. Develop and describe the entity-relationship diagram. 2. Use normalization to assure the correctness of the tables (relations), 3. Create the database using a personal DBMS package (preferably Microsoft Access). 4. Use the DBMS package to create the basic report in Figure GP.1. SOME PARTICULARS YOU SHOULD KNOW 1. You may not be able to develop a report that looks exactly like the one in Figure GP.1. However, your report should include the same information. 2. Complete personnel information is tracked by another database. For this application, include only the minimum employee number, last name, and first name. 3. Information concerning all projects, employees, and jobs is not readily available. You should, however, create information for several fictitious systems to include in your database. 4. File: Not applicable.
 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

A purchasing agent for a particular type of silicon wafer used in the production of semiconductors must decide among three sources. Source A will sell the silicon wafers for $2.5 per wafer, independently of the number of wafers ordered. Source B will sell the wafers for $2.4 each but will not consider an order for fewer than 3,000 wafers, and Source C will sell the wafers for $2.30 each but will not accept an order for fewer than 4,000 wafers. (These conditions are summarized in the table below.)

Assume a reorder cost of $100 and an annual requirement of 20,000 wafers. Assume a 20 percent annual interest rate for holding cost calculations.

Table 1. Quantity discount in unit cost

SOURCE UNIT COST ORDER QUANTITY RANGE
A $2.5 No restriction
B $2.4 3000 <= Q
C $2.3 4000 <= Q

(a) Which source should be used, and what is the best order quantity of the selected source that minimizes the total cost?

(b) If the replenishment lead time for wafers is 3 months, determine the reorder level (ROL) based on the on-hand level of inventory of wafers. Use the best Q in the question (a).

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

The Rhythm Nightclub only had one exit route available on the night of the deadly fire. Three doorways are included in this lone path out of the structure. The first is a 32 inch door between the dance floor and the lobby. The next is a set of double doors with a total width of 6 feet. The final door is 3 feet 2 inches wide. Overlook the fact that several doors in the means of egress opened inward. Assume all widths are clear widths. Based on this single exit route, what is the egress capacity for this building? Question 19 options: 1) 160 2) 190 3) 250 4) 320
 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"

solution

Rick manages a small clothing store. He is responsible for 10 casual staff. He regularly meets with his team-members to understand their needs, challenges and what support they need to do their job well. He also speaks with them about the number of sales they achieved for the previous week. In particular he discusses sales that went well and those that did not deliver value or never went through. As a manager, Rick is using which of two functions of management: O Organising and controlling O Motivating and analysing O Leading and motivating ho O Planning and leading O Leading and controlling
 