Which of the following statements regarding the tenant’s responsibility for defective conditions on the leased premises is true?
|
The tenant generally has the duty to correct any defects on the premises. |
||
|
The tenant is generally required to return the premises to the landlord in the same condition they were in at the beginning of the lease. |
||
|
The landlord is liable for any damage done by the tenants to the leased premises. |
Part Two.
The covenant of quiet enjoyment protects the tenant from all of the following except:
|
Wrongful or retaliatory eviction. |
||
|
Threatening actions by the landlord. |
||
|
Landlord interference with tenant’s possession of property. |
||
|
The tenant is protected from all of the above under the covenant of quiet enjoyment. |
Salvatore Adamo was the head of Vintel Corp ’ s Risk Management Department. His responsibility was to manage risks for many of the company ’ s products. However, one particular product had major risk implications and mattered to Salvatore the most. It was Vintel ’ s fl agship product and had a very important risk event at stake. The risk at stake had a very low probability of occurring but had a huge potential impact on the company and its future. This was the fi rst time in the company ’ s history that a product with such a low probability risk event could lead to such enormous potential impact. This case presents how Salvatore adjusted Vintel ’ s risk analysis procedure to address this type of risk. RISK ANALYSIS STEPS In order to effectively manage risk for Vintel ’ s product, Salvatore typically followed the standard procedure. He started off with the identifi cation of all potential risks. He then identifi ed the probability and impact of each risk, using a 1 – to – 5 – point scale. For each risk, the risk score was then calculated based on a set formula (Probability + 2 Impact). He then used a Risk Rating table with predetermined thresholds to categorize risks into high (red), medium (yellow), and low (green) severity risks. Typically, the threshold for high risk is 12 and above. Medium risks have a score ranging from 8 to 11. Risks that score below 7 are considered low risks. Usually high risks will get more management attention and Vintel will perform further investigation and come up with appropriate response plans. Medium and low risks will get less management oversight. The use of this procedure would ensure that risks are analyzed in a systematic manner based on their probability and impact. ADJUSTING THE THRESHOLDS Salvatore knew from past experience that in general a very low probability risk event does not have as high a potential impact or a severe outcome. In such a typical situation, using the Risk Rating table in Figure 11.1 should work fi ne. But for this fl agship product, a lot of very low probability risks have a very high level of impact, and using his normal Risk Rating table may not be appropriate. “ Am I right? †Salvatore thought. 246 CASE STUDIES “ I think I am, †Salvatore talked to himself. He knew that he had to adjust his risk thresholds, such that those risks are in the category of high risk. Salvatore had a flashback to his experience with Ford Australia. Several years ago when Salvatore visited Ford Australia for technical exchange, he participated in risk analysis training. One of the risk events they discussed was the SUV tire explosion. Typically, tire explosion is a very low probability risk event . But when it happens, it can cause the vehicles to rollover, which can lead to the severe injury or death of the passengers in the SUV. Besides the safety of the passengers at stake, tire explosion should impact the sales of the SUV by as much as $ 5 billion. This was definitely a high risk. This flashback assured Salvatore that the risk thresholds needed to be adjusted. If not for this flagship product, a risk event like “ tire explosion †would always end up being a medium – level risk and would never get as much management attention as it should. No management attention means no further analysis and no support. Then, if the risk happens, he could not imagine how huge the impact would be. “ Probably not $ 5 billion but it would definitely be ugly and no more future for me at Vintel, †thought Salvatore.
que- discuss how risk management was conducted in this case. A short paragraph as conclusion.
The Ace Machine Company is considering using a priority scheduling rule in its fabrication shop and must decide whether to use: the critical rule, the order slack rule, the shortest operation next rule or the slack per operation rule.
The table below shows the company’s current inventory and shop status.
Exhibit 1
|
Order number |
Manufacturing Lead Time Remaining |
Time Remaining Until Due Date |
Current Operation Processing Time |
Number of Operations Remaining |
Total Processing Time Remaining |
|
1 |
15 |
7 |
2 |
3 |
8 |
|
2 |
15 |
11 |
3 |
4 |
8 |
|
3 |
20 |
-2 |
5 |
2 |
8 |
|
4 |
15 |
-5 |
4 |
3 |
8 |
|
5 |
15 |
3 |
1 |
12 |
8 |
Note: Time is measured in days. Manufacturing lead time remaining includes both the machine processing time and the length of time orders spend moving and waiting to be processed in a machine queue. Current operating processing time (as well as total processing time remaining) includes no move or queue times.
a) State the formula for calculating the priority index for each of sequencing rules given above.
b) Compute the scheduling priority index for each order in Exhibit 1 for the four sequencing rules.