solution
A building-materials firm loads trucks with two pay loader tractors. The distribution of truck-loading times has been found to be exponential with a mean loading_ time of 6 minutes. The truck interarrival time is exponentially distributed with an arrival rate of 16 per hour. The waiting time of a truck and driver is estimated to […]