What is the total cost to move products between workcenters A and B, and between workcenters B and D combined? [Select the appropriate range in which your answer falls.]
The transportation cost is $5.
The load summary: AB = 12, AC = 25, AD = 12, BC = 19, BD = 15, CD = 34.
Layout

Question 12 options:

More than $0 but less than or equal to $100

More than $100 but less than or equal to $200

More than $200 but less than or equal to $300

More than $300 but less than or equal to $400

More than $400

Question 13 (4 points)

A(n) __________ layout is a combination of ___________ and ____________ layouts.

Question 13 options:

workcenter; project; assembly line

project; manufacturing cell; workcenter

assembly line; functional; project

optimum; open; close

manufacturing cell; workcenter; assembly line

Question 14 (4 points)

Which of the following attempts to bring a balance between flexibility and efficiency in a production system?

Question 14 options:

workcenter

manufacturing cell

project layout

assembly line

Question 15 (4 points)

Completion of one or more work packages results in the completion of a ________________.

Question 15 options:

subtask

none of the choices are correct

project

program

task

 