What is the total cost to move products between workcenters A and B, and between workcenters B and D combined? [Select the appropriate range in which your answer falls.]
The transportation cost is $5.
The load summary: AB = 12, AC = 25, AD = 12, BC = 19, BD = 15, CD = 34.
Layout
Question 12 options:
|
More than $0 but less than or equal to $100 |
|
|
More than $100 but less than or equal to $200 |
|
|
More than $200 but less than or equal to $300 |
|
|
More than $300 but less than or equal to $400 |
|
|
More than $400 |
Question 13 (4 points)
A(n) __________ layout is a combination of ___________ and ____________ layouts.
Question 13 options:
|
workcenter; project; assembly line |
|
|
project; manufacturing cell; workcenter |
|
|
assembly line; functional; project |
|
|
optimum; open; close |
|
|
manufacturing cell; workcenter; assembly line |
Question 14 (4 points)
Which of the following attempts to bring a balance between flexibility and efficiency in a production system?
Question 14 options:
|
workcenter |
|
|
manufacturing cell |
|
|
project layout |
|
|
assembly line |
Question 15 (4 points)
Completion of one or more work packages results in the completion of a ________________.
Question 15 options:
|
subtask |
|
|
none of the choices are correct |
|
|
project |
|
|
program |
|
|
task |