QRS Corp. is designing a product layout for a new product. They plan to use this production line ten hours a day in order to meet forecasted demand of 900 units per day. The following table describes the tasks necessary to produce this product: TASK PREDECESSOR TIME(seconds) 34 B A 20 < w Ic IB 10 D IB 16 C 10 IE DE 24 G F 38 Without considering forecasted demand, what is the minimum possible cycle time for this production line? Select one: O a. 10 seconds Ob 38 seconds Oc. 20 seconds Od 34 seconds Oe. 152 seconds Perform line balancing on the network below, assuming CT of 13 minutes and using the ‘the most followers rule then longest time.’ The network is given below with the time duration of each activity written in minutes above each respective activity. After “A” has been chosen, what’s the next eligible activitie(s)? O a. B,C O?. ? ??. ? Od AB
 