solution

POM company produces two products P1 and P2. The market demands are as follows: 100 units from P1 and 150 units from P2. Each unsatisfied demand causes a penalty cost for the company, i.e., 2$ for P1 and 3$ for P2. To produce a single unit from each product corresponding production sources are required:

Product

Worker 1 at station 1

Worker 2 at station 2

Raw material

P1

2 minutes

4 minutes

5 kg

P2

3 minutes

1 minute

3 kg

It is desired to maintain a balanced workload on both workers such that no one works for more than 30 minutes per day longer than the other one. The total available raw material is equal to 700 kg. However, additional raw materials can be acquired from the supplier by paying 1$ per kg. Formulate a linear programming model to minimize the total production cost assuming an 8-hour working day. Please use the given structure while proposing your model:

Parameters and decision variables

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"